ITAC Assessment: LM0033
ITAC logo
ITAC Assessment: LM0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product frozen pies
NAICS
n/a
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 76,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 5,280
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $360,621 3,395,880
kWh
Electricity Demand $54,165 6,504
kW-mo/yr
Electricity Fees $35,873 -
Natural Gas $67,500 10,387
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $923,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.7145: Install skylights $6,143 $10,400 $5,775
40,357
kWh
$368
-
kW-mo/yr
- - -
02 2.7124: Make a practice of turning off lights when not needed $1,578 - $1,441
10,070
kWh
$137
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,854 $370 $2,700
18,866
kWh
$154
-
kW-mo/yr
- - -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $23,073 $31,000 $16,297
113,900
kWh
$6,776
-
kW-mo/yr
- - -
05 2.2515: Use optimum thickness insulation $64,833 $96,800 $62,690
438,100
kWh
$2,143
-
kW-mo/yr
- - -
06 4.422: Utilize outside contracting $22,623 $12,000 $149,919
1,047,725
kWh
$5,124
-
kW-mo/yr
$190,080 $(-322,500.0) -
07 4.652: Replace existing equipment with more suitable substitutes $243,003 $208,000 - - $63,360 $155,643 $24,000
08 4.111: Add equipment/ operators to reduce production bottleneck $237,812 $70,000 - - $237,812 - -
09 4.122: Develop standard procedures to improve internal yields $90,240 $34,800 - - - - $90,240
10 4.111: Add equipment/ operators to reduce production bottleneck $231,120 $395,000 - - $231,120 - -
TOTAL RECOMMENDED $923,279 $858,370 $238,822
1,669,018
kWh
$14,702
-
kW-mo/yr
$722,372 $(-166,857.0) $114,240
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs