Assessment Year | 2002 |
---|---|
Principal Product | frozen pies |
NAICS |
n/a
|
SIC | 2053: Frozen Bakery Products, Except Bread |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
76,000
ft2
|
Annual Production | 1,200,000
pieces
|
Production Hrs. Annual | 5,280
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $360,621 | 3,395,880 |
kWh
|
$0.11 |
Electricity Demand | $54,165 | 6,504 |
kW-mo/yr
|
$8.33 |
Electricity Fees | $35,873 | - |
|
- |
Natural Gas | $67,500 | 10,387 |
MMBtu
|
$6.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $923,279 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7145: Install skylights | $6,143 | $10,400 |
$5,775
40,357
kWh
|
$368
-
kW-mo/yr
|
- | - | - | |
02 | 2.7124: Make a practice of turning off lights when not needed | $1,578 | - |
$1,441
10,070
kWh
|
$137
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,854 | $370 |
$2,700
18,866
kWh
|
$154
-
kW-mo/yr
|
- | - | - | |
04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $23,073 | $31,000 |
$16,297
113,900
kWh
|
$6,776
-
kW-mo/yr
|
- | - | - | |
05 | 2.2515: Use optimum thickness insulation | $64,833 | $96,800 |
$62,690
438,100
kWh
|
$2,143
-
kW-mo/yr
|
- | - | - | |
06 | 4.422: Utilize outside contracting | $22,623 | $12,000 |
$149,919
1,047,725
kWh
|
$5,124
-
kW-mo/yr
|
$190,080 | $(-322,500.0) | - | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $243,003 | $208,000 | - | - | $63,360 | $155,643 | $24,000 | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $237,812 | $70,000 | - | - | $237,812 | - | - | |
09 | 4.122: Develop standard procedures to improve internal yields | $90,240 | $34,800 | - | - | - | - | $90,240 | |
10 | 4.111: Add equipment/ operators to reduce production bottleneck | $231,120 | $395,000 | - | - | $231,120 | - | - | |
TOTAL RECOMMENDED | $923,279 | $858,370 |
$238,822
1,669,018
kWh
|
$14,702
-
kW-mo/yr
|
$722,372 | $(-166,857.0) | $114,240 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs