| Assessment Year | 2002 |
|---|---|
| Principal Product | frozen pies |
| NAICS |
n/a
|
| SIC | 2053: Frozen Bakery Products, Except Bread |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
76,000
ft2
|
| Annual Production | 1,200,000
pieces
|
| Production Hrs. Annual | 5,280
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $360,621 | 3,395,880 |
kWh
|
$0.11 |
| Electricity Demand | $54,165 | 6,504 |
kW-mo/yr
|
$8.33 |
| Electricity Fees | $35,873 | - |
|
- |
| Natural Gas | $67,500 | 10,387 |
MMBtu
|
$6.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $923,279 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7145: Install skylights | $6,143 | $10,400 |
$5,775
40,357
kWh
|
$368
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7124: Make a practice of turning off lights when not needed | $1,578 | - |
$1,441
10,070
kWh
|
$137
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,854 | $370 |
$2,700
18,866
kWh
|
$154
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $23,073 | $31,000 |
$16,297
113,900
kWh
|
$6,776
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.2515: Use optimum thickness insulation | $64,833 | $96,800 |
$62,690
438,100
kWh
|
$2,143
-
kW-mo/yr
|
- | - | - | |
| 06 | 4.422: Utilize outside contracting | $22,623 | $12,000 |
$149,919
1,047,725
kWh
|
$5,124
-
kW-mo/yr
|
$190,080 | $(-322,500.0) | - | |
| 07 | 4.652: Replace existing equipment with more suitable substitutes | $243,003 | $208,000 | - | - | $63,360 | $155,643 | $24,000 | |
| 08 | 4.111: Add equipment/ operators to reduce production bottleneck | $237,812 | $70,000 | - | - | $237,812 | - | - | |
| 09 | 4.122: Develop standard procedures to improve internal yields | $90,240 | $34,800 | - | - | - | - | $90,240 | |
| 10 | 4.111: Add equipment/ operators to reduce production bottleneck | $231,120 | $395,000 | - | - | $231,120 | - | - | |
| TOTAL RECOMMENDED | $923,279 | $858,370 |
$238,822
1,669,018
kWh
|
$14,702
-
kW-mo/yr
|
$722,372 | $(-166,857.0) | $114,240 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs