Assessment Year | 2002 |
---|---|
Principal Product | plastic injection molded parts |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
38,000
ft2
|
Annual Production | 7,500,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $407,334 | 6,187,144 |
kWh
|
$0.066 |
Electricity Demand | $72,320 | 12,359 |
kW-mo/yr
|
$5.85 |
Electricity Fees | $58,089 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $125,130 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $75,897 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Product Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $15,266 | $678 |
$13,478
187,086
kWh
|
$1,788
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7144: Install spectral reflectors / delamp | $1,411 | $3,420 |
$1,242
17,237
kWh
|
$169
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $244 | - |
$193
2,682
kWh
|
$51
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $20,486 | $44,650 |
$18,086
251,059
kWh
|
$2,400
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7124: Make a practice of turning off lights when not needed | $1,152 | $100 |
$1,017
14,112
kWh
|
$135
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $614 | $20 |
$542
7,520
kWh
|
$72
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,421 | $11,800 | - | - |
$6,421
-
lb
|
- | - | - | |
08 | 4.625: Develop standard operating procedures | $19,915 | $8,440 | - | - | - | - | - | $19,915 | |
09 | 4.625: Develop standard operating procedures | $47,795 | $4,337 | - | - | - | - | $47,795 | - | |
10 | 4.311: Schedule deliveries according to demand | $11,826 | $1,000 | - | - | - | $11,826 | - | - | |
TOTAL RECOMMENDED | $125,130 | $74,445 |
$34,558
479,696
kWh
|
$4,615
-
kW-mo/yr
|
$6,421
-
lb
|
$11,826 | $47,795 | $19,915 | ||
TOTAL IMPLEMENTED | $75,897 | $24,697 |
$1,559
21,632
kWh
|
$207
-
kW-mo/yr
|
$6,421
-
lb
|
- | $47,795 | $19,915 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Product Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs