ITAC Assessment: LM0031
ITAC logo
ITAC Assessment: LM0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product plastic injection molded parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 38,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $407,334 6,187,144
kWh
Electricity Demand $72,320 12,359
kW-mo/yr
Electricity Fees $58,089 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $125,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,897

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings Increase in Production Savings
01 2.2511: Insulate bare equipment $15,266 $678 $13,478
187,086
kWh
$1,788
-
kW-mo/yr
- - - -
02 2.7144: Install spectral reflectors / delamp $1,411 $3,420 $1,242
17,237
kWh
$169
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $244 - $193
2,682
kWh
$51
-
kW-mo/yr
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,486 $44,650 $18,086
251,059
kWh
$2,400
-
kW-mo/yr
- - - -
05 2.7124: Make a practice of turning off lights when not needed $1,152 $100 $1,017
14,112
kWh
$135
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $614 $20 $542
7,520
kWh
$72
-
kW-mo/yr
- - - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,421 $11,800 - - $6,421
-
lb
- - -
08 4.625: Develop standard operating procedures $19,915 $8,440 - - - - - $19,915
09 4.625: Develop standard operating procedures $47,795 $4,337 - - - - $47,795 -
10 4.311: Schedule deliveries according to demand $11,826 $1,000 - - - $11,826 - -
TOTAL RECOMMENDED $125,130 $74,445 $34,558
479,696
kWh
$4,615
-
kW-mo/yr
$6,421
-
lb
$11,826 $47,795 $19,915
TOTAL IMPLEMENTED $75,897 $24,697 $1,559
21,632
kWh
$207
-
kW-mo/yr
$6,421
-
lb
- $47,795 $19,915
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs