ITAC Assessment: LM0025
ITAC logo
ITAC Assessment: LM0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product envelopes
NAICS
n/a
SIC 2677: Envelopes
Sales Range $100
M
to 500
M
# of Employees 208
Plant Area 185,000
ft2
Annual Production 2,500,000,000
pieces
Production Hrs. Annual 6,048
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $495,067 6,572,711
kWh
Electricity Demand $146,006 15,192
kW-mo/yr
Electricity Fees $41,501 -
Natural Gas $975 88
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,933 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $98,680

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.4133: Use most efficient type of electric motors $2,567 $3,850 $2,177
20,645
kWh
$390
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,580 $350 $3,787
30,229
kWh
$573
-
kW-mo/yr
$(-780.0) - -
03 2.4221: Install compressor air intakes in coolest locations $4,564 $456 $3,869
36,750
kWh
$695
-
kW-mo/yr
- - -
04 2.7144: Install spectral reflectors / delamp $2,122 $3,375 $1,639
15,551
kWh
$483
-
kW-mo/yr
- - -
05 4.311: Schedule deliveries according to demand $63,600 $15,000 - - - $63,600 -
06 4.625: Develop standard operating procedures $31,500 $9,240 - - - - $31,500
TOTAL RECOMMENDED $107,933 $32,271 $11,472
103,175
kWh
$2,141
-
kW-mo/yr
$(-780.0) $63,600 $31,500
TOTAL IMPLEMENTED $98,680 $24,590 $3,787
30,229
kWh
$573
-
kW-mo/yr
$(-780.0) $63,600 $31,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs