ITAC Assessment: LM0019
ITAC logo
ITAC Assessment: LM0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product tire replacement products
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area 95,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 3,254
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,782 6,933,064
kWh
Electricity Demand $232,396 44,388
kW-mo/yr
Electricity Fees $67,891 -
Natural Gas $94,179 8,733
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,087

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $425 $418 $331
3,177
kWh
$94
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $12,586 $240 $9,774
93,891
kWh
$2,812
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,085 $2,482 $841
8,077
kWh
$244
-
kW-mo/yr
- -
04 4.513: Re-arrange equipment layout to reduce labor costs $3,087 $450 - - $3,087 -
05 4.323: Optimize lot sizes to reduce inventory carrying costs $10,000 $3,000 - - - $10,000
TOTAL RECOMMENDED $27,183 $6,590 $10,946
105,145
kWh
$3,150
-
kW-mo/yr
$3,087 $10,000
TOTAL IMPLEMENTED $13,087 $3,450 - - $3,087 $10,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs