ITAC Assessment: LM0016
ITAC logo
ITAC Assessment: LM0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product stamped steel fasteners
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 250,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 5,904
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $431,405 6,884,012
kWh
Electricity Demand $185,141 28,632
kW-mo/yr
Electricity Fees $90,002 -
Natural Gas $638,392 113,803
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,905,125 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,826,311

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $9,494 $2,500 $8,095
75,976
kWh
$1,399
-
kW-mo/yr
- - -
02 2.2414: Use waste heat from hot flue gases to preheat $50,600 $60,000 - - $50,600
-
MMBtu
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,311 $3,335 $3,677
34,508
kWh
$634
-
kW-mo/yr
- - -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $18,720 $15,300 n/a - - - - $18,720
05 4.625: Develop standard operating procedures $1,482,000 $5,000 - - - - $1,482,000
06 4.625: Develop standard operating procedures $340,000 $310,000 - - - $340,000 -
TOTAL RECOMMENDED $1,905,125 $396,135 $11,772
110,484
kWh
$2,033
-
kW-mo/yr
$50,600
-
MMBtu
$340,000 $1,500,720
TOTAL IMPLEMENTED $1,826,311 $318,335 $3,677
34,508
kWh
$634
-
kW-mo/yr
- $340,000 $1,482,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs