ITAC Assessment: LM0013
ITAC logo
ITAC Assessment: LM0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product fiberglass
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 113,668
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,520
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,936 1,312,400
kWh
Electricity Demand $67,227 10,485
kW-mo/yr
Electricity Fees $24,001 -
Natural Gas $60,280 6,913
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $124,403

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,040 $1,050 $16,420
124,816
kWh
$5,400
-
kW-mo/yr
$(-780.0) -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,817 - $1,055
8,016
kWh
$762
-
kW-mo/yr
- -
03 2.7145: Install skylights $3,232 $4,900 $2,352
17,876
kWh
$880
-
kW-mo/yr
- -
04 2.7144: Install spectral reflectors / delamp $1,152 $1,165 $971
7,384
kWh
$181
-
kW-mo/yr
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $21,776 $300 - - - $21,776
06 4.121: Maintain clean conditions before painting $19,656 $319 - - $19,656 -
07 4.426: Modify workload $43,680 $5,000 - - $43,680 -
08 4.431: Train operators for maximum operating efficiency $16,434 - - - $16,434 -
TOTAL RECOMMENDED $128,787 $12,734 $20,798
158,092
kWh
$7,223
-
kW-mo/yr
$78,990 $21,776
TOTAL IMPLEMENTED $124,403 $6,669 $17,475
132,832
kWh
$6,162
-
kW-mo/yr
$78,990 $21,776
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs