| Assessment Year | 2001 |
|---|---|
| Principal Product | fiberglass |
| NAICS |
n/a
|
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
113,668
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 2,520
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $100,936 | 1,312,400 |
kWh
|
$0.077 |
| Electricity Demand | $67,227 | 10,485 |
kW-mo/yr
|
$6.41 |
| Electricity Fees | $24,001 | - |
|
- |
| Natural Gas | $60,280 | 6,913 |
MMBtu
|
$8.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $128,787 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $124,403 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,040 | $1,050 |
$16,420
124,816
kWh
|
$5,400
-
kW-mo/yr
|
$(-780.0) | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,817 | - |
$1,055
8,016
kWh
|
$762
-
kW-mo/yr
|
- | - | |
| 03 | 2.7145: Install skylights | $3,232 | $4,900 |
$2,352
17,876
kWh
|
$880
-
kW-mo/yr
|
- | - | |
| 04 | 2.7144: Install spectral reflectors / delamp | $1,152 | $1,165 |
$971
7,384
kWh
|
$181
-
kW-mo/yr
|
- | - | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $21,776 | $300 | - | - | - | $21,776 | |
| 06 | 4.121: Maintain clean conditions before painting | $19,656 | $319 | - | - | $19,656 | - | |
| 07 | 4.426: Modify workload | $43,680 | $5,000 | - | - | $43,680 | - | |
| 08 | 4.431: Train operators for maximum operating efficiency | $16,434 | - | - | - | $16,434 | - | |
| TOTAL RECOMMENDED | $128,787 | $12,734 |
$20,798
158,092
kWh
|
$7,223
-
kW-mo/yr
|
$78,990 | $21,776 | ||
| TOTAL IMPLEMENTED | $124,403 | $6,669 |
$17,475
132,832
kWh
|
$6,162
-
kW-mo/yr
|
$78,990 | $21,776 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs