Assessment Year | 2001 |
---|---|
Principal Product | control valves |
NAICS |
n/a
|
SIC | 3822: Automatic Controls for Regulating Residential and Commercial Environments and Appliances |
Sales Range | $100 M to 500M |
# of Employees | 322 |
Plant Area |
232,525
ft2
|
Annual Production | 7,000,000
pieces
|
Production Hrs. Annual | 4,800
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $465,370 | 8,266,369 |
kWh
|
$0.056 |
Electricity Demand | $254,501 | 34,812 |
kW-mo/yr
|
$7.31 |
Electricity Fees | $92,368 | - |
|
- |
Natural Gas | $166,985 | 12,108 |
MMBtu
|
$13.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,543,824 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $35,795 | $195 | n/a |
$30,489
250,031
kWh
|
$6,086
-
kW-mo/yr
|
$(-780.0) | - |
02 | 2.7145: Install skylights | $36,728 | $66,000 | n/a |
$36,728
275,940
kWh
|
- | - | - |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $8,805 | $12,000 | n/a |
$6,258
36,720
kWh
|
$2,547
-
kW-mo/yr
|
- | - |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $95,096 | $450 | n/a | - | - | - | $95,096 |
05 | 4.126: Install sensors to detect defects | $1,277,400 | $300,000 | n/a | - | - | $1,277,400 | - |
06 | 4.431: Train operators for maximum operating efficiency | $90,000 | $45,696 | n/a | - | - | $90,000 | - |
TOTAL RECOMMENDED | $1,543,824 | $424,341 |
$73,475
562,691
kWh
|
$8,633
-
kW-mo/yr
|
$1,366,620 | $95,096 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs