Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product control valves
NAICS
n/a
SIC 3822: Automatic Controls for Regulating Residential and Commercial Environments and Appliances
Sales Range $100
M
to 500
M
# of Employees 322
Plant Area 232,525
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $465,370 8,266,369
kWh
Electricity Demand $254,501 34,812
kW-mo/yr
Electricity Fees $92,368 -
Natural Gas $166,985 12,108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,543,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $35,795 $195 n/a $30,489
250,031
kWh
$6,086
-
kW-mo/yr
$(-780.0) -
02 2.7145: Install skylights $36,728 $66,000 n/a $36,728
275,940
kWh
- - -
03 2.7232: Replace existing hvac unit with high efficiency model $8,805 $12,000 n/a $6,258
36,720
kWh
$2,547
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $95,096 $450 n/a - - - $95,096
05 4.126: Install sensors to detect defects $1,277,400 $300,000 n/a - - $1,277,400 -
06 4.431: Train operators for maximum operating efficiency $90,000 $45,696 n/a - - $90,000 -
TOTAL RECOMMENDED $1,543,824 $424,341 $73,475
562,691
kWh
$8,633
-
kW-mo/yr
$1,366,620 $95,096
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs