ITAC Assessment: LM0008
ITAC logo
ITAC Assessment: LM0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product die castings
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 41,500
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,804 2,260,850
kWh
Electricity Demand $71,187 17,832
kW-mo/yr
Electricity Fees $(-173,521.0) -
Natural Gas $29,839 11,562
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $572,868 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $518,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,518 $500 $1,620
30,062
kWh
$898
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $44,725 $15,270 $29,272
543,084
kWh
$15,453
-
kW-mo/yr
- -
03 2.6121: Reduce hot water temperature to the minimum required $787 - $290
5,376
kWh
$497
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $9,758 $1,463 - - $9,758
-
MMBtu
-
05 4.111: Add equipment/ operators to reduce production bottleneck $36,000 $27,600 - - - $36,000
06 4.431: Train operators for maximum operating efficiency $146,432 $17,000 - - - $146,432
07 4.624: Hire additional personnel to reduce changeout time $332,648 - - - - $332,648
TOTAL RECOMMENDED $572,868 $61,833 $31,182
578,522
kWh
$16,848
-
kW-mo/yr
$9,758
-
MMBtu
$515,080
TOTAL IMPLEMENTED $518,385 $45,100 $1,910
35,438
kWh
$1,395
-
kW-mo/yr
- $515,080
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs