ITAC Assessment: MI0390
ITAC logo
ITAC Assessment: MI0390
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Plastic parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 31
Plant Area 26,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,041 1,125,380
kWh
Electricity Demand $31,087 2,761
kW-mo/yr
Electricity Fees $12,883 -
TOTAL YEARLY COSTS $100,011
RECOMMENDED SAVINGS* $15,884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,949

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7221: Lower temperature during the winter season and vice-versa $8,273 $1,040 $6,370
127,400
kWh
$1,903
-
kW-mo/yr
02 2.7425: Clean or color roof to reduce solar load $4,349 $7,564 $1,568
31,360
kWh
$2,781
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,676 $3,477 $1,045
20,898
kWh
$631
-
kW-mo/yr
04 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $1,586 $1,120 $989
19,776
kWh
$597
-
kW-mo/yr
TOTAL RECOMMENDED $15,884 $13,201 $9,972
199,434
kWh
$5,912
-
kW-mo/yr
TOTAL IMPLEMENTED $9,949 $4,517 $7,415
148,298
kWh
$2,534
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs