ITAC Assessment: LM0005
ITAC logo
ITAC Assessment: LM0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product scanners
NAICS
n/a
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 42,300
ft2
Annual Production 200
pieces
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,215 437,280
kWh
Electricity Demand $6,632 1,212
kW-mo/yr
Electricity Fees $6,812 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $205,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,222

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $635 $100 $293
5,952
kWh
$342
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $587 $115 $204
4,156
kWh
$383
-
kW-mo/yr
- -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $25,900 $12,500 - - $25,900
-
lb
-
04 4.652: Replace existing equipment with more suitable substitutes $3,600 - - - - $3,600
05 4.431: Train operators for maximum operating efficiency $168,480 $45,830 - - - $168,480
06 4.122: Develop standard procedures to improve internal yields $6,000 $5,000 - - - $6,000
TOTAL RECOMMENDED $205,202 $63,545 $497
10,108
kWh
$725
-
kW-mo/yr
$25,900
-
lb
$178,080
TOTAL IMPLEMENTED $1,222 $215 $497
10,108
kWh
$725
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs