| Assessment Year | 2001 |
|---|---|
| Principal Product | scanners |
| NAICS |
n/a
|
| SIC | 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments |
| Sales Range | $10 M to 50M |
| # of Employees | 83 |
| Plant Area |
42,300
ft2
|
| Annual Production | 200
pieces
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $31,215 | 437,280 |
kWh
|
$0.071 |
| Electricity Demand | $6,632 | 1,212 |
kW-mo/yr
|
$5.47 |
| Electricity Fees | $6,812 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $205,202 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,222 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $635 | $100 |
$293
5,952
kWh
|
$342
-
kW-mo/yr
|
- | - | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $587 | $115 |
$204
4,156
kWh
|
$383
-
kW-mo/yr
|
- | - | |
| 03 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $25,900 | $12,500 | - | - |
$25,900
-
lb
|
- | |
| 04 | 4.652: Replace existing equipment with more suitable substitutes | $3,600 | - | - | - | - | $3,600 | |
| 05 | 4.431: Train operators for maximum operating efficiency | $168,480 | $45,830 | - | - | - | $168,480 | |
| 06 | 4.122: Develop standard procedures to improve internal yields | $6,000 | $5,000 | - | - | - | $6,000 | |
| TOTAL RECOMMENDED | $205,202 | $63,545 |
$497
10,108
kWh
|
$725
-
kW-mo/yr
|
$25,900
-
lb
|
$178,080 | ||
| TOTAL IMPLEMENTED | $1,222 | $215 |
$497
10,108
kWh
|
$725
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs