ITAC Assessment: LM0004
ITAC logo
ITAC Assessment: LM0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product electronic chasis
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $1
M
to 5
M
# of Employees 42
Plant Area 39,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,673 504,040
kWh
Electricity Demand $39,620 3,924
kW-mo/yr
Electricity Fees $12,097 -
Natural Gas $2,700 275
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $310,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7145: Install skylights $8,789 $8,500 $4,301
61,880
kWh
$4,488
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,547 $725 $2,748
39,536
kWh
$2,359
-
kW-mo/yr
$(-1,560.0) -
03 2.7111: Reduce illumination to minimum necessary levels $910 $1,530 $514
7,390
kWh
$396
-
kW-mo/yr
- -
04 2.3191: Use demand controller or load shedder $8,492 $1,950 - $8,492
-
kW-mo/yr
- -
05 4.122: Develop standard procedures to improve internal yields $3,420 $1,000 - - $3,420 -
06 4.321: Optimize production lot sizes and inventories $666 $1,000 - - - $666
07 4.321: Optimize production lot sizes and inventories $44,800 $1,000 - - - $44,800
08 4.521: Clear and rent existing space $240,000 $25,000 - - - $240,000
TOTAL RECOMMENDED $310,624 $40,705 $7,563
108,806
kWh
$15,735
-
kW-mo/yr
$1,860 $285,466
TOTAL IMPLEMENTED $49,013 $2,725 $2,748
39,536
kWh
$2,359
-
kW-mo/yr
$(-1,560.0) $45,466
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs