ITAC Assessment: LL0365
ITAC logo
ITAC Assessment: LL0365
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Oilfield Fabrication
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 300,000
units
Production Hrs. Annual 3,432
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,975 924,528
kWh
Electricity Fees $1,912 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,891

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $20,891 $900 $20,403
235,872
kWh
$488 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,777 $1,920 $3,689
42,644
kWh
$88 -
03 4.611: Begin a practice of predictive / preventative maintenance $2,712 $360 $1,183
13,682
kWh
$28 $1,500
04 2.7134: Use photocell controls $739 $30 $722
8,347
kWh
$17 -
05 2.7135: Install occupancy sensors $327 $1,035 $319
3,691
kWh
$8 -
06 2.7111: Reduce illumination to minimum necessary levels $215 $180 $210
2,426
kWh
$5 -
07 2.6211: Conserve energy by efficient use of vending machines $155 $184 $151
1,747
kWh
$4 -
TOTAL RECOMMENDED $28,815 $4,609 $26,677
308,409
kWh
$638 $1,500
TOTAL IMPLEMENTED $20,891 $900 $20,403
235,872
kWh
$488 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs