Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Refinished Aircraft
NAICS 488190: Other Support Activities for Air Transportation
SIC 4581: Airports, Flying Fields, and Airport Terminal Services
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 160,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,713 3,299,108
kWh
Electricity Demand $111,860 9,974
kW-mo/yr
Natural Gas $193,931 20,046
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,531 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,858

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,983 $2,990 $20,983
315,055
kWh
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $10,159 $30 $10,159
152,531
kWh
- - - -
03 4.611: Begin a practice of predictive / preventative maintenance $3,717 $600 $2,217
33,284
kWh
- - - $1,500
04 2.7224: Reduce space conditioning during non-working hours $2,597 $360 $2,597
39,000
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,380 $840 $531
7,967
kWh
$122
-
kW-mo/yr
- - $727
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,059 $3,150 $860
12,908
kWh
$199
-
kW-mo/yr
- - -
07 2.6211: Conserve energy by efficient use of vending machines $815 $1,286 $815
12,230
kWh
- - - -
08 2.7135: Install occupancy sensors $208 $600 $208
3,122
kWh
- - - -
09 2.2511: Insulate bare equipment $178 $165 - - $178
-
MMBtu
- -
10 2.7111: Reduce illumination to minimum necessary levels $72 $30 $41
610
kWh
$32
-
kW-mo/yr
- - -
11 4.611: Begin a practice of predictive / preventative maintenance $4,365 $2,490 - - - $4,365 -
TOTAL RECOMMENDED $45,531 $12,541 $38,409
576,707
kWh
$353
-
kW-mo/yr
$178
-
MMBtu
$4,365 $2,227
TOTAL IMPLEMENTED $34,858 $3,620 $33,358
500,870
kWh
- - - $1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs