ITAC Assessment: LL0358
ITAC logo
ITAC Assessment: LL0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product oil field tools
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 84
Plant Area 65,000
ft2
Annual Production 325,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,882 1,141,700
kWh
Electricity Demand $48,400 4,652
kW-mo/yr
LPG $51,407 2,084
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,948 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,435

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,312 $6,320 $15,596
225,738
kWh
$1,716
-
kW-mo/yr
- - - -
02 2.2511: Insulate bare equipment $15,407 $440 - - $15,407
-
MMBtu
- - -
03 4.611: Begin a practice of predictive / preventative maintenance $8,131 $900 $6,631
95,981
kWh
- - - - $1,500
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,716 $45 $3,716
53,785
kWh
- - - - -
05 2.4239: Eliminate or reduce compressed air usage $2,857 $3,750 $2,857
41,356
kWh
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,159 $700 $459
6,639
kWh
$95
-
kW-mo/yr
- $362 $243 -
07 2.6211: Conserve energy by efficient use of vending machines $729 $919 $604
8,736
kWh
$125
-
kW-mo/yr
- - - -
08 2.7111: Reduce illumination to minimum necessary levels $333 $160 $219
3,163
kWh
$114
-
kW-mo/yr
- - - -
09 2.7135: Install occupancy sensors $304 $700 $304
4,399
kWh
- - - - -
TOTAL RECOMMENDED $49,948 $13,934 $30,386
439,797
kWh
$2,050
-
kW-mo/yr
$15,407
-
MMBtu
$362 $243 $1,500
TOTAL IMPLEMENTED $36,435 $6,805 $19,312
279,523
kWh
$1,716
-
kW-mo/yr
$15,407
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs