Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Injected molded goods
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 30,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,009 591,000
kWh
Electricity Fees $3,598 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,792 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,798

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $2,759 $180 $1,259
14,414
kWh
- - $1,500
02 2.7224: Reduce space conditioning during non-working hours $1,768 $60 $1,768
20,250
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,130 $60 $1,130
12,943
kWh
- - -
04 2.7134: Use photocell controls $740 $90 $740
8,475
kWh
- - -
05 2.7111: Reduce illumination to minimum necessary levels $362 $320 $362
4,147
kWh
- - -
06 2.4322: Use or replace with energy efficient substitutes $298 $160 $298
3,418
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $223 $40 $223
2,553
kWh
- - -
08 2.7135: Install occupancy sensors $181 $240 $181
2,074
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $178 $105 $81
996
kWh
$6 $91 -
10 2.6211: Conserve energy by efficient use of vending machines $153 $195 $153
1,747
kWh
- - -
TOTAL RECOMMENDED $7,792 $1,450 $6,195
71,017
kWh
$6 $91 $1,500
TOTAL IMPLEMENTED $6,798 $535 $5,201
59,631
kWh
$6 $91 $1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs