ITAC Assessment: LL0349
ITAC logo
ITAC Assessment: LL0349
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Beer and root beer
NAICS 312111: Soft Drink Manufacturing
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 30,000
ft2
Annual Production 110,000
bbl
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,669 2,540,600
kWh
Electricity Demand $73,750 7,375
kW-mo/yr
Natural Gas $98,951 18,569
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,877 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,074

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,074 $4,720 $16,074
242,117
kWh
- -
02 4.611: Begin a practice of predictive / preventative maintenance $2,614 $150 $1,114
16,773
kWh
- $1,500
03 4.611: Begin a practice of predictive / preventative maintenance $1,752 $384 - - $1,752
04 2.2511: Insulate bare equipment $1,238 $2,563 - $1,238
-
MMBtu
-
05 2.6211: Conserve energy by efficient use of vending machines $116 $195 $116
1,747
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $83 $51 $83
1,250
kWh
- -
TOTAL RECOMMENDED $21,877 $8,063 $17,387
261,887
kWh
$1,238
-
MMBtu
$3,252
TOTAL IMPLEMENTED $16,074 $4,720 $16,074
242,117
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs