ITAC Assessment: AM0485
ITAC logo
ITAC Assessment: AM0485
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Electrical conduit and raceways
NAICS 335932: Noncurrent-Carrying Wiring Device Manufacturing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $50
M
to 100
M
# of Employees 45
Plant Area 101,700
ft2
Annual Production 104,000
pieces
Production Hrs. Annual 2,325
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,222 746,320
kWh
Electricity Demand $15,105 5,718
kW-mo/yr
Electricity Fees $975 -
Natural Gas $11,970 1,265
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,947

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $25,045 $660 $19,645
169,500
kWh
$5,400
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,290 $600 $8,850
76,400
kWh
$2,440
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $4,150 $11,235 - $4,150
-
kW-mo/yr
- -
04 2.7124: Make a practice of turning off lights when not needed $2,130 - $2,130
18,400
kWh
- - -
05 2.4314: Use synthetic lubricant $715 - $560
4,829
kWh
$155
-
kW-mo/yr
- -
06 2.8123: Pay utility bills on time $270 - - - $270 -
07 2.8112: Combine utility meters $212 - - - $212 -
08 2.8121: Apply for tax-free status for energy purchases $800 $320 - - $160 $640
09 2.8121: Apply for tax-free status for energy purchases $425 $170 - - $85 $340
TOTAL RECOMMENDED $45,037 $12,985 $31,185
269,129
kWh
$12,145
-
kW-mo/yr
$727 $980
TOTAL IMPLEMENTED $38,947 $1,260 $30,625
264,300
kWh
$7,840
-
kW-mo/yr
$482 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs