ITAC Assessment: LL0348
ITAC logo
ITAC Assessment: LL0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product valves
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 358,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,025,232 19,152,000
kWh
Natural Gas $49,152 4,227
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,962 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $126,027

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 4.611: Begin a practice of predictive / preventative maintenance $102,711 $10,348 - - $102,711
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,376 $12,200 $17,376
324,606
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $4,789 $5,670 $4,789
89,463
kWh
- -
04 2.6211: Conserve energy by efficient use of vending machines $935 $1,838 $935
17,472
kWh
- -
05 2.7135: Install occupancy sensors $605 $4,020 $605
11,311
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $366 $3,220 $366
6,839
kWh
- -
07 2.2511: Insulate bare equipment $145 $356 - $145
-
MMBtu
-
08 2.2511: Insulate bare equipment $35 $56 $35
645
kWh
- -
TOTAL RECOMMENDED $126,962 $37,708 $24,106
450,336
kWh
$145
-
MMBtu
$102,711
TOTAL IMPLEMENTED $126,027 $35,870 $23,171
432,864
kWh
$145
-
MMBtu
$102,711
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs