Assessment Year | 2011 |
---|---|
Principal Product | valves |
NAICS | 332911: Industrial Valve Manufacturing |
SIC | 3491: Industrial Valves |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
358,000
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,025,232 | 19,152,000 |
kWh
|
$0.054 |
Natural Gas | $49,152 | 4,227 |
MMBtu
|
$11.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $126,962 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $126,027 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 4.611: Begin a practice of predictive / preventative maintenance | $102,711 | $10,348 | - | - | $102,711 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,376 | $12,200 |
$17,376
324,606
kWh
|
- | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $4,789 | $5,670 |
$4,789
89,463
kWh
|
- | - | |
04 | 2.6211: Conserve energy by efficient use of vending machines | $935 | $1,838 |
$935
17,472
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $605 | $4,020 |
$605
11,311
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $366 | $3,220 |
$366
6,839
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $145 | $356 | - |
$145
-
MMBtu
|
- | |
08 | 2.2511: Insulate bare equipment | $35 | $56 |
$35
645
kWh
|
- | - | |
TOTAL RECOMMENDED | $126,962 | $37,708 |
$24,106
450,336
kWh
|
$145
-
MMBtu
|
$102,711 | ||
TOTAL IMPLEMENTED | $126,027 | $35,870 |
$23,171
432,864
kWh
|
$145
-
MMBtu
|
$102,711 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs