ITAC Assessment: LL0343
ITAC logo
ITAC Assessment: LL0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Corrugated boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 105
Plant Area 193,830
ft2
Annual Production 92,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $672,139 9,058,000
kWh
Natural Gas $384,228 73,052
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $210,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $193,579

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $106,373 $5,110 - $106,373
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $81,368 $27,800 $81,368
1,096,599
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $16,390 $810 $16,390
220,896
kWh
-
04 2.2511: Insulate bare equipment $5,155 $2,526 - $5,155
-
MMBtu
05 2.7144: Install spectral reflectors / delamp $320 $455 $320
4,316
kWh
-
06 2.7135: Install occupancy sensors $368 $840 $368
4,955
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $363 $225 $363
4,897
kWh
-
08 2.6211: Conserve energy by efficient use of vending machines $259 $312 $259
3,494
kWh
-
TOTAL RECOMMENDED $210,596 $38,078 $99,068
1,335,157
kWh
$111,528
-
MMBtu
TOTAL IMPLEMENTED $193,579 $36,116 $82,051
1,105,812
kWh
$111,528
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs