| Assessment Year | 2021 |
|---|---|
| Principal Product | beer |
| NAICS | 312120: Breweries |
| SIC | 2082: Malt Beverages |
| Sales Range | $10 M to 50M |
| # of Employees | 170 |
| Plant Area |
80,000
ft2
|
| Annual Production | 130,000
bbl
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $97,611 | 2,225,438 |
kWh
|
$0.044 | |
| Electricity Demand | $109,006 | 5,769 |
kW-mo/yr
|
$18.90 | |
| Electricity Fees | $501 | - |
|
- | |
| Natural Gas | $86,498 | 19,195 |
MMBtu
|
$4.51 | |
| Waste Disposal Costs | |||||
| Water Usage | $40,000 | 13,000 |
Tgal
|
$3.08 | |
| Gaseous Waste | $108,339 | 1,371,380 |
lb
|
$0.079 | |
| TOTAL YEARLY COSTS | $441,955 | ||||
| RECOMMENDED SAVINGS* | $28,748 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $28,472 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Gaseous Waste Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3141: Use battery storage for demand control | $10,391 | $42,800 |
$1,087
25,393
kWh
|
$9,304
-
kW-mo/yr
|
- | |
| 02 | 2.9114: Use solar heat to make electricty | $1,867 | $5,500 |
$614
14,354
kWh
|
$1,253
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,685 | $3,756 |
$1,380
32,245
kWh
|
$1,305
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,196 | $200 |
$680
15,892
kWh
|
$516
-
kW-mo/yr
|
- | |
| 05 | 3.1161: Eliminate/reduce an operation | $12,333 | $94,800 | - | - |
$12,333
-
lb
|
|
| 06 | 2.7135: Install occupancy sensors | $276 | $723 |
$276
6,324
kWh
|
- | - | |
| TOTAL RECOMMENDED | $28,748 | $147,779 |
$4,037
94,208
kWh
|
$12,378
-
kW-mo/yr
|
$12,333
-
lb
|
||
| TOTAL IMPLEMENTED | $28,472 | $147,056 |
$3,761
87,884
kWh
|
$12,378
-
kW-mo/yr
|
$12,333
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Gaseous Waste Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs