Assessment Year | 2010 |
---|---|
Principal Product | Aluminum Extrusions |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $100 M to 500M |
# of Employees | 257 |
Plant Area |
430,000
ft2
|
Annual Production | 350,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,330,820 | 19,820,400 |
kWh
|
$0.067 |
Natural Gas | $2,349,940 | 225,970 |
MMBtu
|
$10.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $108,830 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $90,249 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $88,374 | $59,360 |
$88,374
1,286,480
kWh
|
- | |
02 | 4.611: Begin a practice of predictive / preventative maintenance | $11,781 | $4,070 | - | $11,781 | |
03 | 2.7135: Install occupancy sensors | $2,266 | $1,800 |
$2,266
33,756
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,153 | $10,605 |
$2,153
32,074
kWh
|
- | |
05 | 2.7224: Reduce space conditioning during non-working hours | $1,875 | $1,650 |
$1,875
27,930
kWh
|
- | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $1,079 | $695 |
$1,079
16,072
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,067 | $700 |
$460
6,657
kWh
|
$607 | |
08 | 2.6211: Conserve energy by efficient use of vending machines | $235 | $319 |
$235
3,494
kWh
|
- | |
TOTAL RECOMMENDED | $108,830 | $79,199 |
$96,442
1,406,463
kWh
|
$12,388 | ||
TOTAL IMPLEMENTED | $90,249 | $61,010 |
$90,249
1,314,410
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs