ITAC Assessment: LL0329
ITAC logo
ITAC Assessment: LL0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Environmental Services
NAICS 562213: Solid Waste Combustors and Incinerators
SIC 4953: Refuse Systems
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 200,000
ft2
Annual Production 14,600
Tgal
Production Hrs. Annual 2,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,668 1,510,614
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,231

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,056 $1,870 $4,056
62,401
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $520 $350 $216
3,326
kWh
$304
03 2.7135: Install occupancy sensors $175 $330 $175
2,698
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $117 $120 $117
1,800
kWh
-
05 2.6211: Conserve energy by efficient use of vending machines $114 $167 $114
1,747
kWh
-
TOTAL RECOMMENDED $4,982 $2,837 $4,678
71,972
kWh
$304
TOTAL IMPLEMENTED $4,231 $2,200 $4,231
65,099
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs