ITAC Assessment: LL0324
ITAC logo
ITAC Assessment: LL0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Munitions
NAICS 332993: Ammunition (except Small Arms) Manufacturing
SIC 3483: Ammunition, Except for Small Arms
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 124,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,945 3,707,212
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,862 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,066

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.7224: Reduce space conditioning during non-working hours $51,066 $5,850 $51,066
655,200
kWh
-
02 4.611: Begin a practice of predictive / preventative maintenance $3,552 $1,140 $2,052
26,333
kWh
$1,500
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,908 $265 $1,908
24,480
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,689 $1,050 $778
9,986
kWh
$911
05 2.6211: Conserve energy by efficient use of vending machines $1,089 $1,246 $1,089
13,978
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $258 $120 $258
3,315
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $158 $1,435 $158
2,030
kWh
-
08 2.7135: Install occupancy sensors $142 $270 $142
1,827
kWh
-
TOTAL RECOMMENDED $59,862 $11,376 $57,451
737,149
kWh
$2,411
TOTAL IMPLEMENTED $51,066 $5,850 $51,066
655,200
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs