ITAC Assessment: LL0316
ITAC logo
ITAC Assessment: LL0316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Tobasco Hot Sauce
NAICS 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 500,000
ft2
Annual Production 102,400,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $339,049 3,427,400
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,163 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,754

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,707 $1,980 $5,707
57,598
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,047 $30 $5,047
51,019
kWh
-
03 4.611: Begin a practice of predictive / preventative maintenance $2,762 $150 $262
2,652
kWh
$2,500
04 2.6211: Conserve energy by efficient use of vending machines $791 $1,565 $791
8,000
kWh
-
05 2.7224: Reduce space conditioning during non-working hours $585 $396 $585
5,909
kWh
-
06 2.7135: Install occupancy sensors $271 $90 $271
2,742
kWh
-
TOTAL RECOMMENDED $15,163 $4,211 $12,663
127,920
kWh
$2,500
TOTAL IMPLEMENTED $10,754 $2,010 $10,754
108,617
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs