ITAC Assessment: LL0315
ITAC logo
ITAC Assessment: LL0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Pleasure boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 114,000
ft2
Annual Production 1,400
pieces
Production Hrs. Annual 2,288
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,507 741,440
kWh
Electricity Demand $19,355 2,877
kW-mo/yr
Electricity Fees $5,827 -
Natural Gas $36,148 2,942
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,916 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,935

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,024 $4,200 $3,770
65,761
kWh
$254
02 2.7224: Reduce space conditioning during non-working hours $1,718 $300 $1,610
28,080
kWh
$108
03 2.6211: Conserve energy by efficient use of vending machines $641 $927 $601
10,483
kWh
$40
04 2.7224: Reduce space conditioning during non-working hours $235 $495 $220
3,840
kWh
$15
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $193 $1,020 $181
3,152
kWh
$12
06 2.7135: Install occupancy sensors $61 $240 $57
1,002
kWh
$4
07 2.2511: Insulate bare equipment $44 $177 $41
723
kWh
$3
TOTAL RECOMMENDED $6,916 $7,359 $6,480
113,041
kWh
$436
TOTAL IMPLEMENTED $5,935 $5,520 $5,561
96,993
kWh
$374
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs