ITAC Assessment: LL0307
ITAC logo
ITAC Assessment: LL0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Oilfield treatment chemicals
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 18
Plant Area 20,000
ft2
Annual Production 39,600,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,706 334,019
kWh
Electricity Fees $888 -
Natural Gas $33,386 2,062
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,994 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,491

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2511: Insulate bare equipment $8,550 $1,841 - - $8,550
-
MMBtu
-
02 2.4239: Eliminate or reduce compressed air usage $7,776 $6,070 $7,601
65,597
kWh
$175 - -
03 2.7224: Reduce space conditioning during non-working hours $3,201 $64 $3,129
27,005
kWh
$72 - -
04 2.7111: Reduce illumination to minimum necessary levels $2,773 $870 $2,711
23,398
kWh
$62 - -
05 4.611: Begin a practice of predictive / preventative maintenance $2,650 $180 $1,124
9,697
kWh
$26 - $1,500
06 2.7132: Install timers on light switches in little used areas $2,164 $45 $2,115
18,248
kWh
$49 - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $948 $10 $927
8,001
kWh
$21 - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $518 $40 $506
4,364
kWh
$12 - -
09 2.6211: Conserve energy by efficient use of vending machines $414 $312 $405
3,494
kWh
$9 - -
TOTAL RECOMMENDED $28,994 $9,432 $18,518
159,804
kWh
$426 $8,550
-
MMBtu
$1,500
TOTAL IMPLEMENTED $14,491 $2,931 $4,341
37,459
kWh
$100 $8,550
-
MMBtu
$1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs