ITAC Assessment: LL0300
ITAC logo
ITAC Assessment: LL0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Barges
NAICS 336611: Ship Building and Repairing
SIC 3731: Ship Building and Repairing
Sales Range $50
M
to 100
M
# of Employees 379
Plant Area 350,000
ft2
Annual Production 8
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $597,198 9,224,292
kWh
Electricity Fees $19,708 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,241 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,926

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $53,924 $44,605 $52,201
806,327
kWh
$1,723
02 2.7134: Use photocell controls $39,957 $450 $38,680
597,469
kWh
$1,277
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $12,064 $4,650 $11,682
179,452
kWh
$382
04 2.7224: Reduce space conditioning during non-working hours $3,002 $750 $2,909
44,928
kWh
$93
05 2.7135: Install occupancy sensors $918 $1,875 $888
13,724
kWh
$30
06 2.6211: Conserve energy by efficient use of vending machines $376 $946 $364
5,616
kWh
$12
TOTAL RECOMMENDED $110,241 $53,276 $106,724
1,647,516
kWh
$3,517
TOTAL IMPLEMENTED $56,926 $45,355 $55,110
851,255
kWh
$1,816
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs