ITAC Assessment: LL0291
ITAC logo
ITAC Assessment: LL0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Sheet metal parts
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 76
Plant Area 66,455
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,590
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,594 1,962,760
kWh
Electricity Fees $5,684 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $769

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $40,254 $14,080 $38,968
451,337
kWh
$1,286 -
02 2.4239: Eliminate or reduce compressed air usage $4,189 $722 $4,055
46,965
kWh
$134 -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,965 $7,500 $1,902
22,032
kWh
$63 -
04 2.6211: Conserve energy by efficient use of vending machines $779 $775 $754
8,736
kWh
$25 -
05 2.7111: Reduce illumination to minimum necessary levels $589 $150 $570
6,598
kWh
$19 -
06 2.7224: Reduce space conditioning during non-working hours $276 $231 $267
3,098
kWh
$9 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $180 $105 $86
999
kWh
$3 $91
TOTAL RECOMMENDED $48,232 $23,563 $46,602
539,765
kWh
$1,539 $91
TOTAL IMPLEMENTED $769 $255 $656
7,597
kWh
$22 $91
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs