ITAC Assessment: LL0285
ITAC logo
ITAC Assessment: LL0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Flow meeters
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $100
M
to 500
M
# of Employees 30
Plant Area 14,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,612 338,123
kWh
Electricity Demand $4,747 1,579
kW-mo/yr
Electricity Fees $1,233 -
Natural Gas $1,508 84
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,032

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $3,109 $60 $1,558
16,150
kWh
$51 $1,500
02 2.4238: Do not use compressed air for personal cooling $1,914 $1,160 $1,853
19,208
kWh
$61 -
03 2.7135: Install occupancy sensors $1,056 $900 $1,022
10,596
kWh
$34 -
04 2.7111: Reduce illumination to minimum necessary levels $603 $252 $584
6,060
kWh
$19 -
05 2.7224: Reduce space conditioning during non-working hours $291 $330 $282
2,923
kWh
$9 -
06 2.4239: Eliminate or reduce compressed air usage $145 $1,734 $140
1,455
kWh
$5 -
07 2.6211: Conserve energy by efficient use of vending machines $115 $319 $111
1,150
kWh
$4 -
08 2.2511: Insulate bare equipment $99 $81 $96
994
kWh
$3 -
TOTAL RECOMMENDED $7,332 $4,836 $5,646
58,536
kWh
$186 $1,500
TOTAL IMPLEMENTED $6,032 $2,121 $4,388
45,491
kWh
$144 $1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs