ITAC Assessment: LL0284
ITAC logo
ITAC Assessment: LL0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Sliced meat
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 230,000
ft2
Annual Production 55,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,061,453 16,313,221
kWh
Electricity Demand $2,091 601
kW-mo/yr
Electricity Fees $72,553 -
Natural Gas $361,006 51,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,996 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2441: Preheat boiler makeup water with waste process heat $52,170 $49,000 - - - $52,170
-
MMBtu
-
02 2.4239: Eliminate or reduce compressed air usage $33,682 $1,600 $31,537
484,663
kWh
- $2,145 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,045 $12,575 $19,705
302,823
kWh
- $1,340 - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $16,900 $1,500 - - - $16,900
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,314 $2,100 $1,300
19,973
kWh
$97
-
kW-mo/yr
$95 - $1,822
06 2.6211: Conserve energy by efficient use of vending machines $1,700 $2,074 $1,482
22,776
kWh
$109
-
kW-mo/yr
$109 - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,030 $451 $964
14,808
kWh
- $66 - -
08 2.2511: Insulate bare equipment $155 $102 - - - $155
-
MMBtu
-
TOTAL RECOMMENDED $129,996 $69,402 $54,988
845,043
kWh
$206
-
kW-mo/yr
$3,755 $69,225
-
MMBtu
$1,822
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs