ITAC Assessment: GT0570
ITAC logo
ITAC Assessment: GT0570
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Sodium Silicate
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 15
Plant Area 30,000
ft2
Annual Production 36,500
ton
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,625 1,068,875
kWh
Natural Gas $631,507 217,873
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $124,065 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,895

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $3,890 $3,400 $(-190.0)
(-4,396)
kWh
- $4,080
-
Tgal
02 2.2192: Use heat exchange fluids instead of steam in pipeline tracing systems $3,045 $3,100 - $3,045
-
MMBtu
-
03 2.2135: Repair and eliminate steam leaks $1,850 $300 - $1,850
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $890 $3,980 $890
11,137
kWh
- -
05 2.2414: Use waste heat from hot flue gases to preheat $113,700 $200,000 - $113,700
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $690 $1,370 $690
15,240
kWh
- -
TOTAL RECOMMENDED $124,065 $212,150 $1,390
21,981
kWh
$118,595
-
MMBtu
$4,080
-
Tgal
TOTAL IMPLEMENTED $4,895 $3,400 - $4,895
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs