ITAC Assessment: LL0273
ITAC logo
ITAC Assessment: LL0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product fryers
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 6,300
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,086 4,864,000
kWh
Electricity Demand $129,852 12,048
kW-mo/yr
Electricity Fees $8,875 -
Natural Gas $7,332 563
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,281 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,986

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $37,538 $74,520 $36,339
1,270,691
kWh
- $1,199 -
02 2.7224: Reduce space conditioning during non-working hours $9,733 $357 $9,422
329,443
kWh
- $311 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,583 $1,225 $333
11,651
kWh
$172
-
kW-mo/yr
$17 $1,061
04 2.7111: Reduce illumination to minimum necessary levels $715 $345 $228
7,956
kWh
$464
-
kW-mo/yr
$23 -
05 2.6211: Conserve energy by efficient use of vending machines $313 $623 $200
6,989
kWh
$103
-
kW-mo/yr
$10 -
06 2.7135: Install occupancy sensors $59 $60 $57
1,987
kWh
- $2 -
07 4.611: Begin a practice of predictive / preventative maintenance $2,340 $1,318 - - - $2,340
TOTAL RECOMMENDED $52,281 $78,448 $46,579
1,628,717
kWh
$739
-
kW-mo/yr
$1,562 $3,401
TOTAL IMPLEMENTED $47,986 $75,222 $45,989
1,608,090
kWh
$464
-
kW-mo/yr
$1,533 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings