ITAC Assessment: LL0269
ITAC logo
ITAC Assessment: LL0269
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Sugar
NAICS 311314: Cane Sugar Manufacturing
SIC 2062: Cane Sugar Refining
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 650,000
ft2
Annual Production 900,000
ton
Production Hrs. Annual 2,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $491,940 5,295,500
kWh
Electricity Demand $45,060 21,662
kW-mo/yr
Electricity Fees $20,230 -
Wood $842,105 1,684,210
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $712,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $647,490

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3321: Use steam pressure reduction to generate power $573,938 $2,150,000 $688,000
7,405,813
kWh
- $25,938 $(-140,000.0)
-
MMBtu
- -
02 2.2135: Repair and eliminate steam leaks $60,227 $12,430 - - - $60,227
-
MMBtu
- -
03 2.2441: Preheat boiler makeup water with waste process heat $31,500 $21,500 - - - $31,500
-
MMBtu
- -
04 2.2121: Increase amount of condensate returned $22,967 $178,238 - - - $22,967
-
MMBtu
- -
05 2.3212: Optimize plant power factor $8,830 $4,603 - - $8,830 - - -
06 4.611: Begin a practice of predictive / preventative maintenance $6,878 $164 $249
2,675
kWh
- $9 - $5,120 $1,500
07 2.7134: Use photocell controls $3,736 $270 $3,600
38,752
kWh
- $136 - - -
08 2.7111: Reduce illumination to minimum necessary levels $1,485 $195 $1,388
14,939
kWh
$43
-
kW-mo/yr
$54 - - -
09 2.4313: Provide proper maintenance of motor driven equipment $1,192 $720 $1,149
12,363
kWh
- $43 - - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $763 $546 $735
7,917
kWh
- $28 - - -
11 2.6211: Conserve energy by efficient use of vending machines $694 $623 $649
6,989
kWh
$20
-
kW-mo/yr
$25 - - -
12 4.821: Pay bills on time to avoid late fees $118 - - - $118 - - -
13 2.2511: Insulate bare equipment $34 $442 - - - $34
-
MMBtu
- -
TOTAL RECOMMENDED $712,362 $2,369,731 $695,770
7,489,448
kWh
$63
-
kW-mo/yr
$35,181 $(-25,272.0)
-
MMBtu
$5,120 $1,500
TOTAL IMPLEMENTED $647,490 $2,164,221 $694,386
7,474,542
kWh
$43
-
kW-mo/yr
$26,180 $(-79,739.0)
-
MMBtu
$5,120 $1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs