ITAC Assessment: LL0260
ITAC logo
ITAC Assessment: LL0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Steel Joist and Gerters
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 503
Plant Area 193,430
ft2
Annual Production 82,000
ton
Production Hrs. Annual 4,992
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,277 6,316,280
kWh
Electricity Demand $96,404 17,361
kW-mo/yr
Electricity Fees $31,015 -
Natural Gas $92,512 8,388
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,189 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,162

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $11,704 $5,420 $3,075
67,891
kWh
- $249 $6,880 $1,500
02 4.611: Begin a practice of predictive / preventative maintenance $7,890 $5,109 - - - $7,890 -
03 2.4239: Eliminate or reduce compressed air usage $3,503 $3,652 $3,075
67,891
kWh
- $428 - -
04 2.7134: Use photocell controls $3,127 $630 $2,893
63,860
kWh
- $234 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,371 $600 $1,268
27,996
kWh
- $103 - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,087 $770 $332
7,323
kWh
$56
-
kW-mo/yr
$31 $668 -
07 2.7111: Reduce illumination to minimum necessary levels $756 $359 $560
12,369
kWh
$139
-
kW-mo/yr
$57 - -
08 2.7135: Install occupancy sensors $751 $600 $695
15,352
kWh
- $56 - -
TOTAL RECOMMENDED $30,189 $17,140 $11,898
262,682
kWh
$195
-
kW-mo/yr
$1,158 $15,438 $1,500
TOTAL IMPLEMENTED $14,162 $6,790 $4,675
103,210
kWh
$56
-
kW-mo/yr
$383 $7,548 $1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs