| Assessment Year | 2006 |
|---|---|
| Principal Product | Steel Joist and Gerters |
| NAICS | 332312: Fabricated Structural Metal Manufacturing |
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $50 M to 100M |
| # of Employees | 503 |
| Plant Area |
193,430
ft2
|
| Annual Production | 82,000
ton
|
| Production Hrs. Annual | 4,992
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $286,277 | 6,316,280 |
kWh
|
$0.045 |
| Electricity Demand | $96,404 | 17,361 |
kW-mo/yr
|
$5.55 |
| Electricity Fees | $31,015 | - |
|
- |
| Natural Gas | $92,512 | 8,388 |
MMBtu
|
$11.03 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,189 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,162 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.611: Begin a practice of predictive / preventative maintenance | $11,704 | $5,420 |
$3,075
67,891
kWh
|
- | $249 | $6,880 | $1,500 | |
| 02 | 4.611: Begin a practice of predictive / preventative maintenance | $7,890 | $5,109 | - | - | - | $7,890 | - | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $3,503 | $3,652 |
$3,075
67,891
kWh
|
- | $428 | - | - | |
| 04 | 2.7134: Use photocell controls | $3,127 | $630 |
$2,893
63,860
kWh
|
- | $234 | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,371 | $600 |
$1,268
27,996
kWh
|
- | $103 | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,087 | $770 |
$332
7,323
kWh
|
$56
-
kW-mo/yr
|
$31 | $668 | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $756 | $359 |
$560
12,369
kWh
|
$139
-
kW-mo/yr
|
$57 | - | - | |
| 08 | 2.7135: Install occupancy sensors | $751 | $600 |
$695
15,352
kWh
|
- | $56 | - | - | |
| TOTAL RECOMMENDED | $30,189 | $17,140 |
$11,898
262,682
kWh
|
$195
-
kW-mo/yr
|
$1,158 | $15,438 | $1,500 | ||
| TOTAL IMPLEMENTED | $14,162 | $6,790 |
$4,675
103,210
kWh
|
$56
-
kW-mo/yr
|
$383 | $7,548 | $1,500 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs