Assessment Year | 2006 |
---|---|
Principal Product | extruded aluminum |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $50 M to 100M |
# of Employees | 285 |
Plant Area |
500,000
ft2
|
Annual Production | 80,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,204,090 | 27,279,900 |
kWh
|
$0.081 |
Electricity Demand | $10,248 | 18,636 |
kW-mo/yr
|
$0.55 |
Electricity Fees | $25,982 | - |
|
- |
Natural Gas | $4,644,512 | 440,708 |
MMBtu
|
$10.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,319 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,034 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $19,091 | $3,880 | - | - | - |
$19,091
-
MMBtu
|
- | |
02 | 2.2511: Insulate bare equipment | $18,943 | $4,090 | - | - | - |
$18,943
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $5,345 | $2,565 | - | - | - |
$5,345
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $5,323 | $1,185 | - | - | - |
$5,323
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,656 | $1,920 |
$7,567
93,655
kWh
|
- | $89 | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $867 | $555 |
$403
4,993
kWh
|
$4
-
kW-mo/yr
|
$5 | - | $455 | |
07 | 2.2511: Insulate bare equipment | $94 | $102 |
$93
1,147
kWh
|
- | $1 | - | - | |
TOTAL RECOMMENDED | $57,319 | $14,297 |
$8,063
99,795
kWh
|
$4
-
kW-mo/yr
|
$95 |
$48,702
-
MMBtu
|
$455 | ||
TOTAL IMPLEMENTED | $38,034 | $7,970 | - | - | - |
$38,034
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs