ITAC Assessment: LL0254
ITAC logo
ITAC Assessment: LL0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product extruded aluminum
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $50
M
to 100
M
# of Employees 285
Plant Area 500,000
ft2
Annual Production 80,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,204,090 27,279,900
kWh
Electricity Demand $10,248 18,636
kW-mo/yr
Electricity Fees $25,982 -
Natural Gas $4,644,512 440,708
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,034

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2135: Repair and eliminate steam leaks $19,091 $3,880 - - - $19,091
-
MMBtu
-
02 2.2511: Insulate bare equipment $18,943 $4,090 - - - $18,943
-
MMBtu
-
03 2.2511: Insulate bare equipment $5,345 $2,565 - - - $5,345
-
MMBtu
-
04 2.2511: Insulate bare equipment $5,323 $1,185 - - - $5,323
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,656 $1,920 $7,567
93,655
kWh
- $89 - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $867 $555 $403
4,993
kWh
$4
-
kW-mo/yr
$5 - $455
07 2.2511: Insulate bare equipment $94 $102 $93
1,147
kWh
- $1 - -
TOTAL RECOMMENDED $57,319 $14,297 $8,063
99,795
kWh
$4
-
kW-mo/yr
$95 $48,702
-
MMBtu
$455
TOTAL IMPLEMENTED $38,034 $7,970 - - - $38,034
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs