ITAC Assessment: LL0252
ITAC logo
ITAC Assessment: LL0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product PVC
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $100
M
to 500
M
# of Employees 71
Plant Area 125,000
ft2
Annual Production 500,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,105,578 36,060,000
kWh
Natural Gas $1,650,136 172,681
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $115,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.2135: Repair and eliminate steam leaks $91,633 $1,740 - $91,633
-
MMBtu
-
02 2.4239: Eliminate or reduce compressed air usage $21,878 $4,680 $21,878
254,095
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $1,298 $240 $1,298
15,076
kWh
- -
04 2.2164: Turn off steam tracing during mild weather $1,157 $170 - $1,157
-
MMBtu
-
05 2.4239: Eliminate or reduce compressed air usage $1,064 $159 $1,064
12,383
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $886 $525 $430
4,993
kWh
- $456
07 2.7135: Install occupancy sensors $182 $120 $182
2,112
kWh
- -
08 2.2511: Insulate bare equipment $76 $79 - $76
-
MMBtu
-
TOTAL RECOMMENDED $118,174 $7,713 $24,852
288,659
kWh
$92,866
-
MMBtu
$456
TOTAL IMPLEMENTED $115,630 $7,194 $22,308
259,088
kWh
$92,866
-
MMBtu
$456
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs