Assessment Year | 2006 |
---|---|
Principal Product | PVC |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $100 M to 500M |
# of Employees | 71 |
Plant Area |
125,000
ft2
|
Annual Production | 500,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,105,578 | 36,060,000 |
kWh
|
$0.086 |
Natural Gas | $1,650,136 | 172,681 |
MMBtu
|
$9.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $118,174 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $115,630 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $91,633 | $1,740 | - |
$91,633
-
MMBtu
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $21,878 | $4,680 |
$21,878
254,095
kWh
|
- | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $1,298 | $240 |
$1,298
15,076
kWh
|
- | - | |
04 | 2.2164: Turn off steam tracing during mild weather | $1,157 | $170 | - |
$1,157
-
MMBtu
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $1,064 | $159 |
$1,064
12,383
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $886 | $525 |
$430
4,993
kWh
|
- | $456 | |
07 | 2.7135: Install occupancy sensors | $182 | $120 |
$182
2,112
kWh
|
- | - | |
08 | 2.2511: Insulate bare equipment | $76 | $79 | - |
$76
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $118,174 | $7,713 |
$24,852
288,659
kWh
|
$92,866
-
MMBtu
|
$456 | ||
TOTAL IMPLEMENTED | $115,630 | $7,194 |
$22,308
259,088
kWh
|
$92,866
-
MMBtu
|
$456 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs