ITAC Assessment: LL0251
ITAC logo
ITAC Assessment: LL0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Hot rolled steel products
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $100
M
to 500
M
# of Employees 284
Plant Area 125,000
ft2
Annual Production 135,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $459,181 18,716,542
kWh
Electricity Demand $277,298 52,013
kW-mo/yr
Electricity Fees $3,950 -
Natural Gas $2,383,834 527,365
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $510,868 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,894

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.1125: Convert to oxyfuel burners $457,261 $150,000 - - - $457,261
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,258 $11,040 $16,171
660,028
kWh
- $87 - -
03 2.2511: Insulate bare equipment $19,891 $2,392 - - - $19,891
-
MMBtu
-
04 2.7134: Use photocell controls $4,548 $450 $4,524
164,664
kWh
- $24 - -
05 4.611: Begin a practice of predictive / preventative maintenance $3,060 $3,280 - - - - $3,060
06 2.4239: Eliminate or reduce compressed air usage $1,767 $3,600 $1,758
71,735
kWh
- $9 - -
07 2.2511: Insulate bare equipment $6,369 $9,300 - - - $6,369
-
MMBtu
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $634 $787 $631
25,755
kWh
- $3 - -
09 2.7111: Reduce illumination to minimum necessary levels $508 $960 $95
3,871
kWh
$410
-
kW-mo/yr
$3 - -
10 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $302 $930 $300
12,247
kWh
- $2 - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $270 $245 $57
2,330
kWh
- $3 - $210
TOTAL RECOMMENDED $510,868 $182,984 $23,536
940,630
kWh
$410
-
kW-mo/yr
$131 $483,521
-
MMBtu
$3,270
TOTAL IMPLEMENTED $26,894 $12,479 $631
25,755
kWh
- $3 $26,260
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs