ITAC Assessment: LL0244
ITAC logo
ITAC Assessment: LL0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Polyethylene
NAICS 324199: All Other Petroleum and Coal Products Manufacturing
SIC 2999: Products of Petroleum and Coal, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 94,700
ft2
Annual Production 88,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,353,975 25,885,934
kWh
Electricity Demand $296,512 44,927
kW-mo/yr
Electricity Fees $4,903 -
Natural Gas $1,814,223 269,571
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $826,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $316,725

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.2121: Increase amount of condensate returned $490,346 $849,320 - $429,845
-
MMBtu
$60,501
-
Tgal
02 2.2135: Repair and eliminate steam leaks $240,584 $34,600 - $240,584
-
MMBtu
-
03 2.7224: Reduce space conditioning during non-working hours $72,332 $3,042 $72,332
1,382,760
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,933 $122,080 $14,933
285,462
kWh
- -
05 2.7135: Install occupancy sensors $3,024 $300 $3,024
57,817
kWh
- -
06 2.2511: Insulate bare equipment $2,093 $313 - $2,093
-
MMBtu
-
07 2.2511: Insulate bare equipment $1,716 $913 - $1,716
-
MMBtu
-
08 2.7134: Use photocell controls $1,606 $150 $1,606
30,704
kWh
- -
TOTAL RECOMMENDED $826,634 $1,010,718 $91,895
1,756,743
kWh
$674,238
-
MMBtu
$60,501
-
Tgal
TOTAL IMPLEMENTED $316,725 $38,868 $72,332
1,382,760
kWh
$244,393
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs