ITAC Assessment: GT0894
ITAC logo
ITAC Assessment: GT0894
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Trienol
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 200,000
ft2
Annual Production 15,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,448 4,566,135
kWh
Electricity Demand $83,314 8,291
kW-mo/yr
Electricity Fees $20,316 -
Natural Gas $182,647 29,795
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $122,501 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1133: Adjust burners for efficient operation $5,045 - - - $6,545
-
MMBtu
$(-1,500.0)
02 2.7134: Use photocell controls $235 $270 $235
4,198
kWh
- - -
03 2.2511: Insulate bare equipment $656 $1,300 $656
11,700
kWh
- - -
04 2.2121: Increase amount of condensate returned $5,680 $7,500 - - $5,680
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,887 $3,466 $8,887
158,415
kWh
- - -
06 2.2136: Install / repair insulation on steam lines $11,820 $11,820 - - $11,820
-
MMBtu
-
07 2.2437: Recover waste heat from equipment $20,940 $78,000 - - $20,940
-
MMBtu
-
08 2.2622: Replace existing chiller with high efficiency model $65,080 $150,000 $41,650
742,480
kWh
$23,430
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $4,158 $32,620 $3,234
57,641
kWh
$924
-
kW-mo/yr
- -
TOTAL RECOMMENDED $122,501 $284,976 $54,662
974,434
kWh
$24,354
-
kW-mo/yr
$44,985
-
MMBtu
$(-1,500.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs