Assessment Year | 2012 |
---|---|
Principal Product | Trienol |
NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
200,000
ft2
|
Annual Production | 15,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $195,448 | 4,566,135 |
kWh
|
$0.043 |
Electricity Demand | $83,314 | 8,291 |
kW-mo/yr
|
$10.05 |
Electricity Fees | $20,316 | - |
|
- |
Natural Gas | $182,647 | 29,795 |
MMBtu
|
$6.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $122,501 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1133: Adjust burners for efficient operation | $5,045 | - | - | - |
$6,545
-
MMBtu
|
$(-1,500.0) | |
02 | 2.7134: Use photocell controls | $235 | $270 |
$235
4,198
kWh
|
- | - | - | |
03 | 2.2511: Insulate bare equipment | $656 | $1,300 |
$656
11,700
kWh
|
- | - | - | |
04 | 2.2121: Increase amount of condensate returned | $5,680 | $7,500 | - | - |
$5,680
-
MMBtu
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,887 | $3,466 |
$8,887
158,415
kWh
|
- | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $11,820 | $11,820 | - | - |
$11,820
-
MMBtu
|
- | |
07 | 2.2437: Recover waste heat from equipment | $20,940 | $78,000 | - | - |
$20,940
-
MMBtu
|
- | |
08 | 2.2622: Replace existing chiller with high efficiency model | $65,080 | $150,000 |
$41,650
742,480
kWh
|
$23,430
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,158 | $32,620 |
$3,234
57,641
kWh
|
$924
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $122,501 | $284,976 |
$54,662
974,434
kWh
|
$24,354
-
kW-mo/yr
|
$44,985
-
MMBtu
|
$(-1,500.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs