ITAC Assessment: LL0243
ITAC logo
ITAC Assessment: LL0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Fabricated parts
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 85
Plant Area 27,250
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 5,928
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,958 1,243,750
kWh
Electricity Demand $35,123 4,652
kW-mo/yr
Electricity Fees $4,083 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,617 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $8,455 $575 $6,133
103,147
kWh
- $227 $595 $1,500
02 2.7224: Reduce space conditioning during non-working hours $8,399 $1,521 $8,099
136,211
kWh
- $300 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,122 $440 $1,082
18,196
kWh
- $40 - -
04 2.7111: Reduce illumination to minimum necessary levels $932 $372 $635
10,677
kWh
$264
-
kW-mo/yr
$33 - -
05 2.7134: Use photocell controls $538 $270 $519
8,728
kWh
- $19 - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $527 $30 $508
8,542
kWh
- $19 - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $509 $350 $198
3,329
kWh
- $7 $304 -
08 2.7224: Reduce space conditioning during non-working hours $135 $198 $130
2,189
kWh
- $5 - -
TOTAL RECOMMENDED $20,617 $3,756 $17,304
291,019
kWh
$264
-
kW-mo/yr
$650 $899 $1,500
TOTAL IMPLEMENTED $3,628 $1,462 $2,942
49,472
kWh
$264
-
kW-mo/yr
$118 $304 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs