Assessment Year | 2006 |
---|---|
Principal Product | Fabricated parts |
NAICS | 332313: Plate Work Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $50 M to 100M |
# of Employees | 85 |
Plant Area |
27,250
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 5,928
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,958 | 1,243,750 |
kWh
|
$0.059 |
Electricity Demand | $35,123 | 4,652 |
kW-mo/yr
|
$7.55 |
Electricity Fees | $4,083 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,617 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,628 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.611: Begin a practice of predictive / preventative maintenance | $8,455 | $575 |
$6,133
103,147
kWh
|
- | $227 | $595 | $1,500 | |
02 | 2.7224: Reduce space conditioning during non-working hours | $8,399 | $1,521 |
$8,099
136,211
kWh
|
- | $300 | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,122 | $440 |
$1,082
18,196
kWh
|
- | $40 | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $932 | $372 |
$635
10,677
kWh
|
$264
-
kW-mo/yr
|
$33 | - | - | |
05 | 2.7134: Use photocell controls | $538 | $270 |
$519
8,728
kWh
|
- | $19 | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $527 | $30 |
$508
8,542
kWh
|
- | $19 | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $509 | $350 |
$198
3,329
kWh
|
- | $7 | $304 | - | |
08 | 2.7224: Reduce space conditioning during non-working hours | $135 | $198 |
$130
2,189
kWh
|
- | $5 | - | - | |
TOTAL RECOMMENDED | $20,617 | $3,756 |
$17,304
291,019
kWh
|
$264
-
kW-mo/yr
|
$650 | $899 | $1,500 | ||
TOTAL IMPLEMENTED | $3,628 | $1,462 |
$2,942
49,472
kWh
|
$264
-
kW-mo/yr
|
$118 | $304 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs