Assessment Year | 2005 |
---|---|
Principal Product | Treated wood |
NAICS | 321114: Wood Preservation |
SIC | 2491: Wood Preserving |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
42,000
ft2
|
Annual Production | 2,100,000
pieces
|
Production Hrs. Annual | 4,200
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $219,131 | 4,227,827 |
kWh
|
$0.052 |
Electricity Demand | $92,377 | 12,098 |
kW-mo/yr
|
$7.64 |
Electricity Fees | $11,855 | - |
|
- |
Natural Gas | $557,501 | 91,515 |
MMBtu
|
$6.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $126,284 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $61,847 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2441: Preheat boiler makeup water with waste process heat | $60,523 | - | - | - | - |
$60,523
-
MMBtu
|
- | - | |
02 | 2.2135: Repair and eliminate steam leaks | $47,162 | $3,000 | - | - | - |
$47,162
-
MMBtu
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,179 | $1,500 |
$4,989
96,292
kWh
|
- | $190 | - | - | - | |
04 | 2.2511: Insulate bare equipment | $2,207 | $500 | - | - | - |
$2,207
-
MMBtu
|
- | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $2,065 | - |
$1,622
31,298
kWh
|
$367
-
kW-mo/yr
|
$76 | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $480 | - |
$386
7,454
kWh
|
$76
-
kW-mo/yr
|
$18 | - | - | - | |
07 | 2.7134: Use photocell controls | $354 | - |
$341
6,581
kWh
|
- | $13 | - | - | - | |
08 | 2.7135: Install occupancy sensors | $285 | - |
$275
5,311
kWh
|
- | $10 | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $730 | - |
$259
4,993
kWh
|
- | $10 | - | $461 | - | |
10 | 3.4154: Eliminate leaks in water lines and valves | $7,299 | $1,000 | - | - | - | - | - |
$7,299
-
Tgal
|
|
TOTAL RECOMMENDED | $126,284 | $6,000 |
$7,872
151,929
kWh
|
$443
-
kW-mo/yr
|
$317 |
$109,892
-
MMBtu
|
$461 |
$7,299
-
Tgal
|
||
TOTAL IMPLEMENTED | $61,847 | $6,000 |
$4,989
96,292
kWh
|
- | $190 |
$49,369
-
MMBtu
|
- |
$7,299
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs