Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Treated wood
NAICS 321114: Wood Preservation
SIC 2491: Wood Preserving
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 42,000
ft2
Annual Production 2,100,000
pieces
Production Hrs. Annual 4,200
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,131 4,227,827
kWh
Electricity Demand $92,377 12,098
kW-mo/yr
Electricity Fees $11,855 -
Natural Gas $557,501 91,515
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,284 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,847

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
01 2.2441: Preheat boiler makeup water with waste process heat $60,523 - - - - $60,523
-
MMBtu
- -
02 2.2135: Repair and eliminate steam leaks $47,162 $3,000 - - - $47,162
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,179 $1,500 $4,989
96,292
kWh
- $190 - - -
04 2.2511: Insulate bare equipment $2,207 $500 - - - $2,207
-
MMBtu
- -
05 2.7111: Reduce illumination to minimum necessary levels $2,065 - $1,622
31,298
kWh
$367
-
kW-mo/yr
$76 - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $480 - $386
7,454
kWh
$76
-
kW-mo/yr
$18 - - -
07 2.7134: Use photocell controls $354 - $341
6,581
kWh
- $13 - - -
08 2.7135: Install occupancy sensors $285 - $275
5,311
kWh
- $10 - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $730 - $259
4,993
kWh
- $10 - $461 -
10 3.4154: Eliminate leaks in water lines and valves $7,299 $1,000 - - - - - $7,299
-
Tgal
TOTAL RECOMMENDED $126,284 $6,000 $7,872
151,929
kWh
$443
-
kW-mo/yr
$317 $109,892
-
MMBtu
$461 $7,299
-
Tgal
TOTAL IMPLEMENTED $61,847 $6,000 $4,989
96,292
kWh
- $190 $49,369
-
MMBtu
- $7,299
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs