Assessment Year | 2005 |
---|---|
Principal Product | Sausage |
NAICS | 311611: Animal (except Poultry) Slaughtering |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
20,000
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 3,796
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $128,353 | 1,702,965 |
kWh
|
$0.075 |
Electricity Demand | $37,256 | 6,629 |
kW-mo/yr
|
$5.62 |
Electricity Fees | $5,438 | - |
|
- |
Natural Gas | $48,338 | 6,729 |
MMBtu
|
$7.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,443 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,891 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,322 | $4,300 |
$9,652
128,068
kWh
|
$2,276
-
kW-mo/yr
|
$394 | - | - | - | |
02 | 2.2441: Preheat boiler makeup water with waste process heat | $5,274 | $9,000 | - | - | - |
$5,274
-
MMBtu
|
- | - | |
03 | 2.2511: Insulate bare equipment | $3,312 | $500 | - | - | - |
$3,312
-
MMBtu
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $772 | - |
$747
9,913
kWh
|
- | $25 | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $688 | $300 |
$666
8,866
kWh
|
- | $22 | - | - | - | |
06 | 2.2511: Insulate bare equipment | $295 | $100 | - | - | - |
$295
-
MMBtu
|
- | - | |
07 | 4.611: Begin a practice of predictive / preventative maintenance | $25,780 | - | - | - | - | - | $23,280 | $2,500 | |
TOTAL RECOMMENDED | $48,443 | $14,200 |
$11,065
146,847
kWh
|
$2,276
-
kW-mo/yr
|
$441 |
$8,881
-
MMBtu
|
$23,280 | $2,500 | ||
TOTAL IMPLEMENTED | $21,891 | $14,200 |
$10,318
136,934
kWh
|
$2,276
-
kW-mo/yr
|
$416 |
$8,881
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs