ITAC Assessment: LL0236
ITAC logo
ITAC Assessment: LL0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Sausage
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 20,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 3,796
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,353 1,702,965
kWh
Electricity Demand $37,256 6,629
kW-mo/yr
Electricity Fees $5,438 -
Natural Gas $48,338 6,729
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,891

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,322 $4,300 $9,652
128,068
kWh
$2,276
-
kW-mo/yr
$394 - - -
02 2.2441: Preheat boiler makeup water with waste process heat $5,274 $9,000 - - - $5,274
-
MMBtu
- -
03 2.2511: Insulate bare equipment $3,312 $500 - - - $3,312
-
MMBtu
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $772 - $747
9,913
kWh
- $25 - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $688 $300 $666
8,866
kWh
- $22 - - -
06 2.2511: Insulate bare equipment $295 $100 - - - $295
-
MMBtu
- -
07 4.611: Begin a practice of predictive / preventative maintenance $25,780 - - - - - $23,280 $2,500
TOTAL RECOMMENDED $48,443 $14,200 $11,065
146,847
kWh
$2,276
-
kW-mo/yr
$441 $8,881
-
MMBtu
$23,280 $2,500
TOTAL IMPLEMENTED $21,891 $14,200 $10,318
136,934
kWh
$2,276
-
kW-mo/yr
$416 $8,881
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs