Assessment Year | 2005 |
---|---|
Principal Product | Pipe |
NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
105,000
ft2
|
Annual Production | 200
thousand feet
|
Production Hrs. Annual | 3,744
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $262,101 | 8,451,100 |
kWh
|
$0.031 |
Electricity Demand | $112,068 | 18,249 |
kW-mo/yr
|
$6.14 |
Electricity Fees | $14,218 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,303 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $4,838 | - | - | - | - |
$4,838
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,157 | - |
$3,041
98,070
kWh
|
- | $116 | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,031 | - |
$640
20,639
kWh
|
- | $24 | - | $2,367 | |
04 | 2.7134: Use photocell controls | $1,862 | - |
$1,794
57,862
kWh
|
- | $68 | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,687 | - |
$1,625
52,418
kWh
|
- | $62 | - | - | |
06 | 2.7135: Install occupancy sensors | $1,284 | - |
$1,237
39,890
kWh
|
- | $47 | - | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $1,148 | - |
$566
18,245
kWh
|
$540
-
kW-mo/yr
|
$42 | - | - | |
08 | 2.7224: Reduce space conditioning during non-working hours | $296 | - |
$296
9,217
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $17,303 | - |
$9,199
296,341
kWh
|
$540
-
kW-mo/yr
|
$359 |
$4,838
-
MMBtu
|
$2,367 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs