ITAC Assessment: LL0224
ITAC logo
ITAC Assessment: LL0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Pipe
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 105,000
ft2
Annual Production 200
thousand feet
Production Hrs. Annual 3,744
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,101 8,451,100
kWh
Electricity Demand $112,068 18,249
kW-mo/yr
Electricity Fees $14,218 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Personnel Changes Savings
01 2.7231: Use radiant heater for spot heating $4,838 - - - - $4,838
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,157 - $3,041
98,070
kWh
- $116 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,031 - $640
20,639
kWh
- $24 - $2,367
04 2.7134: Use photocell controls $1,862 - $1,794
57,862
kWh
- $68 - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,687 - $1,625
52,418
kWh
- $62 - -
06 2.7135: Install occupancy sensors $1,284 - $1,237
39,890
kWh
- $47 - -
07 2.7111: Reduce illumination to minimum necessary levels $1,148 - $566
18,245
kWh
$540
-
kW-mo/yr
$42 - -
08 2.7224: Reduce space conditioning during non-working hours $296 - $296
9,217
kWh
- - - -
TOTAL RECOMMENDED $17,303 - $9,199
296,341
kWh
$540
-
kW-mo/yr
$359 $4,838
-
MMBtu
$2,367
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs