ITAC Assessment: LL0213
ITAC logo
ITAC Assessment: LL0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product oil and gas production
NAICS 211111: Crude Petroleum and Natural Gas Extraction
SIC 1311: Crude Petroleum and Natural Gas
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 85,000
ft2
Annual Production 21,900,000
bbl
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Natural Gas $2,000,000 1,002,103
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $677,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $570,749

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2437: Recover waste heat from equipment $479,962 $1,400,000 $479,962
-
MMBtu
- -
02 2.1336: Install equipment to utilize waste fuel $55,846 $100,000 $55,846
-
MMBtu
- -
03 2.2693: Use waste heat steam for absorption refrigeration $47,454 $108,000 $47,454
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,231 $4,806 $5,606
-
MMBtu
$5,625 -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,028 $1,485 $6,028
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,862 $6,160 $4,862
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,051 $2,550 $684
-
MMBtu
$2,367 -
08 2.2511: Insulate bare equipment $1,146 $492 $1,146
-
MMBtu
- -
09 4.611: Begin a practice of predictive / preventative maintenance $67,520 $4,000 - $64,020 $3,500
TOTAL RECOMMENDED $677,100 $1,627,493 $601,588
-
MMBtu
$72,012 $3,500
TOTAL IMPLEMENTED $570,749 $1,416,943 $497,604
-
MMBtu
$69,645 $3,500
Yearly Savings* Imp'd Cost* Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs