| Assessment Year | 2004 |
|---|---|
| Principal Product | oil and gas production |
| NAICS | 211111: Crude Petroleum and Natural Gas Extraction |
| SIC | 1311: Crude Petroleum and Natural Gas |
| Sales Range | $100 M to 500M |
| # of Employees | 150 |
| Plant Area |
85,000
ft2
|
| Annual Production | 21,900,000
bbl
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Natural Gas | $2,000,000 | 1,002,103 |
MMBtu
|
$2.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $677,100 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $570,749 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $479,962 | $1,400,000 |
$479,962
-
MMBtu
|
- | - | |
| 02 | 2.1336: Install equipment to utilize waste fuel | $55,846 | $100,000 |
$55,846
-
MMBtu
|
- | - | |
| 03 | 2.2693: Use waste heat steam for absorption refrigeration | $47,454 | $108,000 |
$47,454
-
MMBtu
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,231 | $4,806 |
$5,606
-
MMBtu
|
$5,625 | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,028 | $1,485 |
$6,028
-
MMBtu
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,862 | $6,160 |
$4,862
-
MMBtu
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,051 | $2,550 |
$684
-
MMBtu
|
$2,367 | - | |
| 08 | 2.2511: Insulate bare equipment | $1,146 | $492 |
$1,146
-
MMBtu
|
- | - | |
| 09 | 4.611: Begin a practice of predictive / preventative maintenance | $67,520 | $4,000 | - | $64,020 | $3,500 | |
| TOTAL RECOMMENDED | $677,100 | $1,627,493 |
$601,588
-
MMBtu
|
$72,012 | $3,500 | ||
| TOTAL IMPLEMENTED | $570,749 | $1,416,943 |
$497,604
-
MMBtu
|
$69,645 | $3,500 | ||
| Yearly Savings* | Imp'd Cost* | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs