Assessment Year | 2004 |
---|---|
Principal Product | Chocolate Beverages |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2020: |
Sales Range | $10 M to 50M |
# of Employees | 46 |
Plant Area |
75,000
ft2
|
Annual Production | 48,895,560
pieces
|
Production Hrs. Annual | 6,732
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $58,828 | 1,241,200 |
kWh
|
$0.047 |
Electricity Demand | $29,241 | 3,841 |
kW-mo/yr
|
$7.61 |
Electricity Fees | $3,443 | - |
|
- |
Natural Gas | $336,926 | 41,751 |
MMBtu
|
$8.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $142,735 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $120,251 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2441: Preheat boiler makeup water with waste process heat | $36,769 | $16,000 | - | - | - |
$36,769
-
MMBtu
|
- | - | - | |
02 | 2.2511: Insulate bare equipment | $34,833 | $7,488 | - | - | - |
$34,833
-
MMBtu
|
- | - | - | |
03 | 2.2121: Increase amount of condensate returned | $6,837 | $12,236 | - | - | - |
$6,170
-
MMBtu
|
- |
$667
-
Tgal
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $3,171 | $225 |
$2,428
51,218
kWh
|
$624
-
kW-mo/yr
|
$119 | - | - | - | - | |
05 | 2.2135: Repair and eliminate steam leaks | $2,149 | $1,960 | - | - | - |
$2,149
-
MMBtu
|
- | - | - | |
06 | 2.7134: Use photocell controls | $449 | $30 |
$432
9,105
kWh
|
- | $17 | - | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $701 | $525 |
$237
4,993
kWh
|
- | $9 | - | $455 | - | - | |
08 | 2.7135: Install occupancy sensors | $99 | $120 |
$95
2,003
kWh
|
- | $4 | - | - | - | - | |
09 | 2.7132: Install timers on light switches in little used areas | $33 | $180 |
$32
674
kWh
|
- | $1 | - | - | - | - | |
10 | 4.611: Begin a practice of predictive / preventative maintenance | $46,500 | $3,150 | - | - | - | - | $44,000 | - | $2,500 | |
11 | 3.4115: Recover and reuse cooling water | $11,194 | $32,000 | - | - | - | - | - |
$11,194
-
Tgal
|
- | |
TOTAL RECOMMENDED | $142,735 | $73,914 |
$3,224
67,993
kWh
|
$624
-
kW-mo/yr
|
$150 |
$79,921
-
MMBtu
|
$44,455 |
$11,861
-
Tgal
|
$2,500 | ||
TOTAL IMPLEMENTED | $120,251 | $28,598 | - | - | - |
$73,751
-
MMBtu
|
$44,000 | - | $2,500 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs