ITAC Assessment: LL0203
ITAC logo
ITAC Assessment: LL0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product boat/repair
NAICS 336611: Ship Building and Repairing
SIC 3731: Ship Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 36
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,205 6,236,982
kWh
Electricity Demand $84,398 14,658
kW-mo/yr
Electricity Fees $36,292 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,378

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7134: Use photocell controls $7,245 $420 $6,610
141,080
kWh
$635 - -
02 2.4239: Eliminate or reduce compressed air usage $3,949 $5,615 $3,603
76,910
kWh
$346 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,314 $2,000 $2,111
45,049
kWh
$203 - -
04 2.7224: Reduce space conditioning during non-working hours $526 $330 $480
10,241
kWh
$46 - -
05 2.7135: Install occupancy sensors $413 $750 $377
8,051
kWh
$36 - -
06 2.7132: Install timers on light switches in little used areas $167 $240 $152
3,253
kWh
$15 - -
07 4.611: Begin a practice of predictive / preventative maintenance $4,000 $60 - - - $4,000
08 4.611: Begin a practice of predictive / preventative maintenance $3,870 $1,014 - - $3,870 -
TOTAL RECOMMENDED $22,484 $10,429 $13,333
284,584
kWh
$1,281 $3,870 $4,000
TOTAL IMPLEMENTED $21,378 $9,109 $12,324
263,039
kWh
$1,184 $3,870 $4,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs