Assessment Year 2004
Principal Product boat/repair
NAICS 336611: Ship Building and Repairing
SIC 3731: Ship Building and Repairing
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 250,000
ft2
Annual Production 150
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,044 6,095,173
kWh
Electricity Demand $6,616 1,867
kW-mo/yr
Electricity Fees $29,466 -
Natural Gas $31,419 3,566
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,637 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,135

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $23,139 $810 $19,107
291,133
kWh
$2,478
-
kW-mo/yr
$1,554 - -
02 2.4239: Eliminate or reduce compressed air usage $14,598 $11,757 $13,618
207,492
kWh
- $980 - -
03 2.7135: Install occupancy sensors $10,904 $960 $10,172
154,989
kWh
- $732 - -
04 2.7134: Use photocell controls $8,001 $420 $7,464
113,724
kWh
- $537 - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $7,518 $30 $7,013
106,852
kWh
- $505 - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,239 $2,120 $4,887
74,456
kWh
- $352 - -
07 2.2511: Insulate bare equipment $1,683 $1,770 - - - $1,683
-
MMBtu
-
08 4.611: Begin a practice of predictive / preventative maintenance $2,500 $60 - - - - $2,500
09 4.611: Begin a practice of predictive / preventative maintenance $2,055 $2,878 - - - - $2,055
TOTAL RECOMMENDED $75,637 $20,805 $62,261
948,646
kWh
$2,478
-
kW-mo/yr
$4,660 $1,683
-
MMBtu
$4,555
TOTAL IMPLEMENTED $50,135 $8,088 $38,471
586,165
kWh
$2,478
-
kW-mo/yr
$2,948 $1,683
-
MMBtu
$4,555
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs