ITAC Assessment: LL0198
ITAC logo
ITAC Assessment: LL0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Vegetable oil
NAICS 311225: Fats and Oils Refining and Blending
SIC 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 68,200
ft2
Annual Production 116,666,667
lb
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,346 5,941,497
kWh
Electricity Demand $91,573 10,439
kW-mo/yr
Electricity Fees $14,045 -
Natural Gas $1,450,749 264,067
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $271,637 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $248,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
01 2.2135: Repair and eliminate steam leaks $241,700 $8,200 - - - $241,700
-
MMBtu
- -
02 2.2121: Increase amount of condensate returned $16,796 $25,635 - - - $9,241
-
MMBtu
- $7,555
-
Tgal
03 2.7134: Use photocell controls $5,421 $180 $5,223
113,128
kWh
- $198 - - -
04 2.2511: Insulate bare equipment $4,981 $942 - - - $4,981
-
MMBtu
- -
05 2.2511: Insulate bare equipment $1,121 $395 - - - $1,121
-
MMBtu
- -
06 2.7111: Reduce illumination to minimum necessary levels $785 $510 $598
12,950
kWh
$158
-
kW-mo/yr
$29 - - -
07 2.7134: Use photocell controls $369 $120 $355
7,692
kWh
- $14 - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $464 $350 $154
3,329
kWh
- $6 - $304 -
TOTAL RECOMMENDED $271,637 $36,332 $6,330
137,099
kWh
$158
-
kW-mo/yr
$247 $257,043
-
MMBtu
$304 $7,555
-
Tgal
TOTAL IMPLEMENTED $248,706 $9,125 $5,377
116,457
kWh
- $204 $242,821
-
MMBtu
$304 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs