Assessment Year | 2004 |
---|---|
Principal Product | Rice |
NAICS | 311212: Rice Milling |
SIC | 2044: Rice Milling |
Sales Range | $5 M to 10M |
# of Employees | 200 |
Plant Area |
160,000
ft2
|
Annual Production | 600,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $887,091 | 14,614,200 |
kWh
|
$0.061 |
Electricity Demand | $151,555 | 30,311 |
kW-mo/yr
|
$5.00 |
Electricity Fees | $117,560 | - |
|
- |
Natural Gas | $42,810 | 9,439 |
MMBtu
|
$4.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $763,069 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $379,633 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $61,940 | $2,960 |
$55,652
916,665
kWh
|
- | $6,288 | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $18,973 | $1,554 |
$14,862
244,849
kWh
|
$2,185
-
kW-mo/yr
|
$1,926 | - | |
03 | 2.7134: Use photocell controls | $12,282 | $798 |
$11,035
181,790
kWh
|
- | $1,247 | - | |
04 | 2.7134: Use photocell controls | $3,174 | $783 |
$2,852
46,992
kWh
|
- | $322 | - | |
05 | 2.7134: Use photocell controls | $3,014 | $651 | - | - | $3,014 | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $529 | $260 |
$202
3,329
kWh
|
- | $23 | $304 | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $345,671 | $400,000 | - | - | - | $345,671 | |
08 | 4.448: Install automatic part storage / retreval system | $199,680 | $390,000 | - | - | - | $199,680 | |
09 | 4.441: Install automatic packing equipment | $99,040 | $130,000 | - | - | - | $99,040 | |
10 | 4.632: Change operating conditions | $18,766 | $24,711 | - | - | - | $18,766 | |
TOTAL RECOMMENDED | $763,069 | $951,717 |
$84,603
1,393,625
kWh
|
$2,185
-
kW-mo/yr
|
$12,820 | $663,461 | ||
TOTAL IMPLEMENTED | $379,633 | $524,514 |
$70,514
1,161,514
kWh
|
$2,185
-
kW-mo/yr
|
$8,214 | $298,720 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs