ITAC Assessment: LL0193
ITAC logo
ITAC Assessment: LL0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Plastic Bags
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area 350,000
ft2
Annual Production 152,000,000
lb
Production Hrs. Annual 8,664
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,602,557 35,046,400
kWh
Electricity Demand $414,157 56,524
kW-mo/yr
Electricity Fees $158,598 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $156,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $144,713

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $118,511 $3,400 $109,834
2,401,791
kWh
- $8,677 -
02 2.3212: Optimize plant power factor $16,033 $25,871 - $16,033
-
kW-mo/yr
- -
03 2.7132: Install timers on light switches in little used areas $12,157 $1,671 $11,267
246,383
kWh
- $890 -
04 2.7111: Reduce illumination to minimum necessary levels $4,526 $390 $3,433
75,065
kWh
$762
-
kW-mo/yr
$331 -
05 2.7135: Install occupancy sensors $195 $135 - - $195 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $468 $350 $152
3,329
kWh
- $12 $304
07 4.611: Begin a practice of predictive / preventative maintenance $4,980 $1,684 - - - $4,980
TOTAL RECOMMENDED $156,870 $33,501 $124,686
2,726,568
kWh
$16,795
-
kW-mo/yr
$10,105 $5,284
TOTAL IMPLEMENTED $144,713 $31,830 $113,419
2,480,185
kWh
$16,795
-
kW-mo/yr
$9,215 $5,284
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs